Search for a WIRS accredited self-lay organisation or WIRSAE provider

We operate the Water Industry Registration Scheme (WIRS) on behalf of water utility companies and the WIRSAE accreditation on behalf of Market Operator Services Ltd (MOSL) and water wholesalers.

A WIRS accredited self-lay organisation may perform works on the connection of water mains and supplies to a property, dependent on the status and scope of accreditation.

A WIRSAE Provider contracted by retailers to carry out accredited work (as defined in the Wholesale Retail Code and detailed in the generic code of practice supplemented by adopting utilities addendums) can be accredited under this scheme. Those Adopting Utilities within England that recognise this scheme will allow WIRSAE Providers that hold the appropriate scopes of accreditation to tender for, and if successful undertake temporary / permanent disconnections and meter installation / replacement works.

1 251 251 results

Filter by

  • JSM Group Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Darren Cooper

  • Complete Moling Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Adam Thompson

  • Nicol of Skene Ltd - MURS

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Peter-Jon Cowe

  • Morris & Bert Water Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Morris

  • Utilities Direct Limited

    Regions East Anglia, Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Loretta Gobbey

  • EEMU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

  • Andrew Sinclair Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Design

    Contact

    Bruce Sinclair

  • OPUS Utility Solutions Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Gavin O’Connor

  • UK Utility Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Pitts

  • USR Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • DaCI Utilities Engineering Consultancy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mohammad Hasan

  • A S Pipelines

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Andrew Croft

  • Excel Pipelines T/A ExcelCS

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Mark Barnes

  • GasDesign Utilities Ltd Trading as GDUK (Utilities)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Andy Ginn

  • TSL Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Robert Forbes

  • Pearce Elite Plumbing & Heating Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Matthew Duggan

  • FCH Construction Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Fraser Hart

  • Energetics Design and Build Limited - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Lee Crabtree

    Notes

    Civil Works associated with the following scopes: Cable Laying (LV, 11kV, 20kV) Cable Jointing (LV Dead, LV Live, 11kV, 20kV) Substation Installation (11kV, 20kV)

  • Erith Connect Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Talbot Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Talbot

  • Davidson Land Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Malcolm Davidson

  • Trust Utility Management Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Special Pipeline Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mick Rice

  • Pipeline Associates Ltd

    Regions South East, South West

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Dan Woolmington

  • SmOp CT Ltd (trading as SmOp Cleantech)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Craig Morton

    Notes

    Civil Works - Excavation and Backfill to Tile Tape Level

  • JRF Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Friday Mafararikwa

  • Fincher Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Avove Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Liz Groundland

  • Heartland Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Robert Ellis

  • Ipswich Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    Jordan Thomas

  • Global Infrastructure Scotland Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Tanya Bartlet

  • McFadden Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sean Staines

  • Chap Group (Aberdeen) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Neil Mutch

  • K M Plant Hire & Groundworks Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Murray Ambler-Shattock

  • J McCann & Co Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James McDaid

  • Radius Subterra

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Garvan Kelly

  • Kilkern Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Martin Gallagher

  • TriConnex Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Hannah Smith

  • Civils Plus Plant and Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Rachel Carroll

  • United Living Water Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Carolan

  • Express Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kerry McDade

  • Billy Miller Contractor & Plant Hire

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Brad Robert Macleod

  • High Voltage Systems and Services (HVSS)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Mark Buckby

    Contact

    Chris Beattie

  • Matrix Networks Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Simon Spencer

  • Pat Munro Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Gary Clark

  • JPS Utilities (Scot) Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lesley Allan

  • CMU Infrastructure Ltd incorporating CM Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    CMU Infrastructure Ltd incorporating CM Utilities Ltd

  • Perch Verify Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

  • Mulholland Contracts Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Scott Lambie

  • AC Water Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Claire Lineham

  • Hydrotech Water Services UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Vince Keenor

  • Utility Solutions Provider Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Neal Cowdell

  • McAndrews Utilities and Civil Engineering

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sean McAndrew

  • MCD Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Donovan Aylott

  • Complete Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Damon Goodwin

  • Fusion Utility Networks

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James Smith

  • The ICP

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • RPS Environmental Management Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

  • The Clancy Group Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Malcom Hazel

    Notes

    .

  • IES Utilities Group

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Innovative Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr John Mason

  • Amjutan Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Mr Justin Woodbridge

  • Green Frog Utilities

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Green Frog Utilities

  • Kier Integrated Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    KIS Proposals

  • Ian Moore Groundworks Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Arcadis Consulting (UK) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Gareth Thompson

  • Dewhurst Utility Services Ltd -MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Jason Critchley

    Contact

    Bill Jones

    Notes

    GIRS - Connections (Non-Routine) Basic (Scope limited to projects up to 2Bar)

  • MCU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mick Coleman

    Notes

    NERS Cable Laying (LV) *restricted to hand pull only

  • CLC Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Freddie Box

    Contact

    Thomas Stoten

  • Ameon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Martin Quinn

  • PowerTek Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Fraser Baxter

  • AIM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Simon Barton

  • Aptus Utilities - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Enquiries Team

    Notes

    GIRS Connections (Non-Routine) Basic - restricted to projects up to 2 Bar

  • Interactive Contact & Resolution Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    Contact

    Richard Denny

  • Total Utility Connections Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Catherine Rowlands

  • Occutrace Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    MIRMS

    Installation or replacement of meter in chamber/box up (to and including 40mm φ)

    ERMIM External Routine Meter Installation Maintenance

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    ERMIM - Temporary Disconnections and Subsequent Reconnections

    MIAES - Installation or replacement meter in existing chamber / inside building up to and including 40mm

    MIAEL - Installation or replacement meter in existing chamber / inside building over 40mm.

    Contact

    David McKenzie

  • Energy Flow Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stuart Hunter

  • Capelwood Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    Tristan Epps

  • Natta Building Company Limited

    Regions Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Utilities

  • William Davis

    Regions Midlands

    WIRS

    CS - Construction of Services

    Contact

    Richard Halford

  • Pro Weld

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Allan Davidson

  • Sustainable Energy Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andrew Holland

  • Watertight Management Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Paul Castle

  • Rosgal Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • M X Construction Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

  • WaterWise Utilities Ltd (formerly DS Construction (Scotland) Ltd )

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • CONNECT3UK LTD

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ainsley McLaughlin

  • NG Tunnelling Ltd

    Regions East Anglia, South East

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Peter Gallagher

    Notes

    13/06/2024 Suspended

  • Water Supply Surveys Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stephen Elliott

    Contact

    Kane Trayling

  • Vital Energi Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Tim McNeilly

  • Heneghan and Sons Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James McDermott

  • M&S Water Services (Utilities) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Thomas Harkin

  • J.S. Pipelines Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Jamie Smith

  • Mott Macdonald

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Stephen Kirby

  • PBU (UK) Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Kevin Wilkinson

  • Flowaime Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Andrea Wright

  • L J Heffernan Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Luke Heffernan

  • Self-Lay Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Toby Judge

  • Integrated Utility Services - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Integrated Utility Services Ltd

    Notes

    Civil Works Associated with Cable Laying (LV, 11kV, 20kV, 33kV & 66kV)

  • S&R Construction Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Danny Scholes

  • Electricity Asset Service Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Stewart Herron

  • UB Civils Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Colin Peteranna

  • OCU Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    James Probert

  • Dumfries and Galloway Utility Company Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ian Carruthers

  • M Group Water (Network Infrastructure) Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andy Stephenson

  • W M Donald Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Rachel O’Donnell

  • JN Civils Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Antony Livingstone

  • Connect It Utility Services Limited - MURS Accredited

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ryan Leech

  • SNR Eng Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Richard Kibbler

  • DJM Services (Pembs) Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Darrell Lewis

  • Air Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Muhammad Asfund Yar Khan

  • Dwr Water Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Harri Pritchard

  • Skanska Construction UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Raj Kumar

  • Jardine Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Jardine

  • OCU Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    James Probert

  • Energy Assets Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Smith

  • Galldris Services (trading as Galldris Construction Ltd.)

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Chris Turok-Hallam

  • Utilitest Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alan Macmillan

  • PTS Utilities Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Richard Paton

  • GS Energy Connections Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Danny Dunstan

  • Bregan Mainsflow Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Glenn Brett

  • Megson Utilities Limited - MURS accredited

    Regions Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Megson

    Notes

    (Civil Work) – as relevant to Construction: Cable Laying – LV, 20kV.

  • Claret Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Potter

  • Dig & Connect Water Services Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mark Aldous

  • Balfour Beatty Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Notes

    Water enquiries Kathryn Vowles, contact details as above. Gas enquiries Willie Duncan, contact details as above.

  • Versatile Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Wayne Gould

  • ML Water Solutions Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Richard Moffat

  • O'Halloran & O'Brien Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    David Briddon

  • J Geraghty Limited

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Jonjo Geraghty

  • Ingenious Power Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Jason Johnson

  • AIS Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Stuart Newton

  • PGL Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Davis

  • Reach Active Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

  • Fulcrum - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Customer Care

  • Network Plus Services Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Assurance Team

  • M.J. ABBOTT LIMITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Adrian Riggs

  • Sapphire Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    John Glover

    Notes

    Partial Accreditation - Excavation and backfill to tile tape level (Civil Work) – as relevant Cable Laying – 20kV, 33kV

  • Therma Mech Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Alex Sargeant

  • Pipework Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Vallely

  • Utility Infrastructure Solutions - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Grayson

    Notes

    GIRS:- Connections (Non-Routine) Basic - Recommended for partial certification (restricted to work up to 2Bar only)

  • Total Pipeline Technology Civil Engineering Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ian Creamer

  • Hydrosave UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Mr Keith Lewcock

  • GTC Infrastructure Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

  • Chapman Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Paul Chapman

  • Quantum Power Connections Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Barhale Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Kelly Waters

  • JRN Contractors Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James Nelson

  • PWG Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Notes

    Network Connections Operational – LV and 11kV (includes 20kV) Network Connections Jointing – 11kV mains and 11kV Terminations (includes 20kV)

  • Swat Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Jake Pariente

  • Harlaxton Engineering Services Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Richard Hibbert

  • Naylor Power Engineering Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Spink

  • Terrafirma Pipeline Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CRMC Construction of Routine Mains Connections

    CMS – Construction of Mains and Services (site works only)

    Contact

    Ivor Wells

  • GCB Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Bennett

  • Underground Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Severn Trent Services

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Nathan Beauchamp

  • Gattica Associates Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mihaela Gafita

  • WSP UK Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Tim Knobbs

  • Stats Utility Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Design

    Contact

    Neil Kempton

  • Ipsum Power (ICP) Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lucy Jarrett

  • Balfour Beatty plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Steve Crossland

  • Pipeline Energy Solutions Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Notes

    NERS Tier 2 Company

  • PN Daly Ltd - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Patrick Daly

  • SAS Utility Services Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mr Stephen Smith

  • Electricity Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Bergin

  • Onsite Central Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Catherine Henderson

  • Excalon Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Danny Wilson

  • Doocey Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    James Ashcroft

  • Tulloch Developments Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Shaun Tulloch

  • Rogers Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Natalie Birch

    Notes

    Full Scopes Construction Only - Excludes Project Management

  • Allan Munro Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Cameron Munro

  • JWA Pipework Solutions Ltd

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jay Ashford

  • Beehive Contractors Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Montore Construction Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Dan Sutton

  • TGL Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • HydroVein (North Avon Group) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    James Probert

  • DAM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Prestige Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stuart Hunter

  • Waterco Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Accounts

  • Morrison Data Services - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    ARMIM Temp disconnections/reconnections

    Contact

    Mr Matthew Barnes

  • Argon Utility Infrastruture Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Beth Taylor

  • AS-Utilities Scotland Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Scott Peters

  • Alconex Infrastructure & Solutions Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kevin Wilkinson

  • Power On

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Tim Erich

  • Networx Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Brimicombe

  • Multi Connex Networks Ltd - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • DT Civils Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Dean Sibley

  • Longsword Building and Maintenance Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • Shadow Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Friday Mafararikwa

  • Bottom Groundworks & Plant Hire Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Brian Campbell

  • Underline Utilities & Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Michael Plausin

  • ARC-Tech MU Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    David Hunter

  • Entity Connect

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Gethin Davies

  • Engage Services (ESL) Limited - WIRSAE

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Neil Taylor

  • EOS Solutions UK Plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    ARMIM Temp disconnections/reconnections

    Contact

    Steve Ridge

  • Draper Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Edward Parv

  • Firdale Construction Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Seivwright Brothers Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Alasdair Seivwright

  • FES Support Services Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Chris Mack

  • Water and Pipeline Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Donald Stocks

  • Nexus Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    John Gaughan / Stephen Gaughan

    Notes

    Administration September 2025

  • BGS Group Ltd (BGS Investment Holdings Ltd.)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jonathan Hopkins

  • ACS Multi Utility Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alister Cameron

  • Advance Utilities (Scotland) Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    David Callaghan

  • UK Power Solutions Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Brian Cooke

  • Infrastructure Gateway - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Ben Brownbill

  • Pressure Test scotland (Water) Ltd

    Regions Scotland

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    David Connell

  • Phoenix Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

    Contact

    Mr Kenny Nicol

  • Shannon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ben Webb

  • GF Job

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ruaridh Stuart

  • Applebridge Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Tomas McGleenan

    Notes

    NERS = Excavation and backfill to tile tape level as relevant to cable lay scopes (Civil Works). GIRS = CNRB Scope restricted to work up to 2 Bar.

  • E&H Building Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Drewie Manson

  • Aquamain (UK) Ltd

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Luke Welch

  • Stantec UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Paul Kalungi

  • J Murphy and Sons Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Sam Polley

    Notes

    Full accreditation for Substation Layouts (11kV, 20kV, 33kV – restricted to 33kV switchgear)

  • Hulley and Kirkwood Consulting Engineers Ltd

    Regions Scotland

    WIRS

    Design

    Contact

    William Fitzpatrick

  • Alexander James Contracts Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Morrison Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Iain Mitchell

    Contact

    Drew Mackie

  • Anparo Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Adam Ferrand

  • F W Huxter Groundworks and Civil Engineering Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • PJ Carey (Contractors) Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Larham

  • Cascade Water Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Hedges

  • GW Cockburn Water and Drainage Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr Gary Collins

  • M&J Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jonathan Buxton

  • Future Energy Networks Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Bret Murphy

  • Hydro Utility Solutions Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mr Tim Stork

  • Bethell Utility Services Ltd - MURS Accredited

    Regions Midlands, North East, North West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Sarah Standish

  • Luce Bay Plant Hire Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Domis Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lee Dunn

  • Pivotal Energy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Amie Norton

  • John Gunn & Sons Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Ian Gunn

Error

Error

No results found

No results found that match your query

Loading results

Approval Key

full approval

Full Accreditation is granted to Providers who have successfully demonstrated that they have adequately met the schemes requirements with respect to the construction of adoptable assets, these Scopes and Services are highlighted in green when fully accredited.

partial approval

Partial Accreditation is the first stage of accreditation showing Scopes and Services highlighted in blue. It demonstrates that a Provider has the required systems, processes, and procedures in place, but has yet to demonstrate these or is currently unavailable to offer work for surveillance to meet the requirements. Providers with partial accreditation can tender and obtain work for the scopes they hold.

approval due to expire

Scopes highlighted in yellow are fully accredited but are due to expire in less than one month.

gap analysis

Scopes highlighted in aqua are for GAP Analysis, meaning the company has the required systems and procedures to do the work but has yet to demonstrate these or is currently unavailable to offer work for surveillance.

approval expired

Scopes highlighted in fuchsia have now expired or have been suspended.

bim ready

BIM Providers who can demonstrate that they have met the requirements of the BIM Guidance document and the referenced standards but do not currently have BIM projects against which they can demonstrate the implementation of those standards

    WIRS Scopes

    Design

    CMS Construction of Mains and Services - All works
    Covers off-site work and on-site work with pipe diameters over 355mm diameter

    CMS Construction of Mains and Services - Site works only
    Covers work on development sites with mains up to 355mm diameter

    CMS Construction of Services on Development Sites
    This scope covers service laying on connections not exceeding 63mm diameter (OD) including services to new on-site mains laid by others.

    PM
    Procedures in place to manage the work and use companies holding construction accreditation.